|
|
|
| Research on the application of dual motor coordinated control system of shearer |
| Li Yue |
| Shanxi Jinshen Energy Co., Ltd, Xinzhou 036500, China |
|
|
|
|
Abstract In order to solve the problems of insufficient driving power of single motor, insufficient synchronous accuracy of master-slave control of double motors and serious wear of mechanical components in shearer traction system, and improve the stability and efficiency of shearer operation, taking MG300/700-WD double drum electric traction shearer as the research object, the parameters of transmission gears and planetary gear trains at all levels of shearer traction system, pin rail and pin wheel are matched and designed. The control effects of master-slave control, parallel control and cross coupling control are compared and analyzed. Finally, the coordinated control of double motors of shearer is realized based on cross coupling control.
|
|
|
|
|
|
| 1 ] 董素玲,王 真. 电牵引采煤机五相逆变器驱动双电动机容错控制[ J ]. 工矿自动化,2015,41( 7 ):48 - 53.
[ 2 ] 李永亮,李大鹏,张旭隆. 双SRM无位置控制系统在采煤机中的应用[ J ]. 电力电子技术,2012( 10 ):73 - 74.
[ 3 ] 刘训涛,刘秀莲,周 平,等. 基于ARIZ91的大功率薄煤层采煤机传动系统设计[ J ]. 煤炭技术,2017,36( 5 ):269 - 272.
[ 4 ] 朱 秀,谢子殿,石 磊. 基于电磁调速的电牵引采煤机调速控制器设计[ J ]. 煤炭科学技术,2008,36( 8 ):70 - 72.
[ 5 ] 黄祯祥,周 书,胡斌梁. 基于双CPU结构的采煤机泵马达多传感器融合与控制系统[ J ]. 煤炭学报,2006,31( 4 ):529 - 534. |
|
|
|