Abstract In view of the problem of large area roof leakage accident in shallow buried deep fully mechanized working face when passing through the structural belt, according to the actual situation of 1805 working face in Shaping Coal Mine, the causes of roof leakage are analyzed, and the treatment scheme after roof leakage is summarized, and the technical measures for advanced prevention of roof leakage are put forward. The field application effect is good, which has certain reference significance for the rapid passage of shallow buried deep fully mechanized working face through the structural belt.
|
|
|
|
|
|
| [ 1 ] 张敦喜,杨永刚,杨张杰,等. 综采工作面断层构造带超前治理成套技术及应用[ J ]. 煤炭科技,2020,41( 4 ):80 - 85.
[ 2 ] 祁建兵,成俊峰,张 鹤. 综采工作面快速过构造新技术应用[ J ]. 煤炭技术,2019,38( 9 ):28 - 31.
[ 3 ] 苏利文. 胀裂破岩技术在综采工作面过构造时的应用[ J ]. 煤炭科技,2019,40( 4 ):67 - 69.
[ 4 ] 王 震,杨 洋. 综采工作面过煤层冲刷带瓦斯防治技术实践[ J ]. 煤炭技术,2020,39( 8 ):104 - 107.
[ 5 ] 韦庆亮,李彦斌,谷 攀,等. 综采工作面过断层顶板破坏机理及控制技术[ J ]. 煤炭工程,2020,52( 4 ):52 - 57.
[ 6 ] 刘洪飞. 综采工作面遇破碎顶板现场控制与管理[ J ]. 煤炭工程,2018,50( S1 ):91 - 93.
[ 7 ] 韩建锋. 大采高综采工作面过复杂地质构造带回采技术[ J ]. 煤炭工程,2013( 1 ):54 - 56.
[ 8 ] 王刚伟. 补连塔煤矿综采工作面过空巷泵送充填式支柱应用
研究[ J ]. 煤炭工程,2020,52( 6 ):38 - 42.
[ 9 ] 王 炜. 高水材料充填支柱在大采高工作面过空巷中的应用
[ J ]. 煤炭工程,2020,52( 5 ):67 - 70.
[ 10 ] 陈胜明,卓 军. 薄煤层综采工作面过复杂构造带回采技术[ J ]. 煤炭技术,2019,38( 8 ):14 - 16.
[ 11 ] 娄 杰,孟庆智. 构造带附近回采工作面内小构造综合预测研究[ J ]. 煤炭科学技术,2017,45( S1 ):180 - 182.
[ 12 ] 朱永建,余伟健. 构造带极不稳定围岩注浆加固效果数值分析[ J ]. 煤炭科学技术,2011,39( 3 ):14 - 17.
[ 13 ] 王 刚,娄 芳,王 震,等. 过断层回采巷道围岩监测与治理实践[ J ]. 煤炭技术,2019,38( 12 ):3 - 6.
[ 14 ] 杨 军,付 强,高玉兵,等. 断层影响下无煤柱自成巷围岩运动及矿压规律[ J ]. 中国矿业大学学报,2019,48( 6 ):1 238 - 1 247. |
|
|
|