Abstract With the gradual reduction of shallow coal seam resources, the deep coal seam mining became the first choice of each major coal mines. In the past, the drilling geological hole work mainly focused on shallow coal seam, while the exploration of deep coal seam was relatively little. In order to explore the deep coal seam or control the deep structure, it was necessary to pass through the goaf of the shallow coal seam, and the goaf became a construction difficulty which affected the drilling hole engineering. At present, the main methods of passing through the goaf were plugging and isolation. It cost a lot of manpower, material resources and time to plug the goaf by using cement and gravel, etc. The effect was relatively poor. It also wasted a certain amount of pipe material to isolate goaf by using conventional casing pipe. The isolating goaf technique by flying pipe only needed casing pipe running in the broken section of goaf, which could reduce the cost of casing pipe, especially in the horizontal branch hole. The technique could reduce unnecessary pipe drawing link in the late stage.
|
|
|
|
|
|
| [ 1 ] 李云霄. 冀中能源股份有限公司邯郸郭二庄矿一坑9号煤奥灰区域探查治理注2孔2-1分支竣工报告[ R ]. 武安市:冀中能源股份有限公司邯郸郭二庄矿,2019.
[ 2 ] 陈平安. 大直径瓦斯孔穿采空区技术[ J ]. 探矿工程,2016,43( 10 ):209 - 214.
[ 3 ] 郑英飞,王茂森. 栾川钼矿采空区钻探技术试验研究[ J ]. 探矿工程,2014,41( 2 ):22 - 25.
[ 4 ] 聂新明. 过采空区成井工艺及固井措施[ J ]. 化工矿产地质,2018,40( 4 ):247 - 251. |
|
|
|