| Practice of open-off cut expanding technology by shearer in fully mechanized caving face of Huoshizui Mine |
| Zhou Gang, Li Shenghu |
| Shaanxi Huoshizui Coal Mine Co., Ltd, Xianyang 713599, China |
|
|
|
|
Abstract Based on the comprehensive comparison of expanding open-off cut by roadheader and shearer, the shearer was selected to expand the side of 8703. The field application showed that the surrounding rock of the open cut was stable, the maximum roof subsidence was 44.9 mm, and the maximum side heave was 20.9 mm. It not only reduced the labor intensity of workers, improved the driving speed, but also realized the installation of the shearer and scraper conveyor, which was conducive to the production of the working face.
|
|
|
|
|
|
| [ 1 ] 陈炎光,陆士良. 中国煤矿巷道围岩控制[ M ]. 徐州:中国矿业大学出版社,1994.
[ 2 ] 马良慧,王建军. 新窑煤矿大断面开切眼一次成巷技术[ J ]. 煤,2013,8( 22 ):28 - 30.
[ 3 ] 张文涛,陈群忠,李爱军,等. 大断面综采开切眼一次成巷施工技术[ J ]. 金属矿山,2013( 7 ):20 - 23.
[ 4 ] 吴继鲁,高建平,申世豹,等. 深井大断面软弱厚煤顶开切眼巷道围岩稳定性及控制[ J ]. 煤炭与化工,2019,42( 10 ):16 - 20.
[ 5 ] 朱建明,杨 冲. 特大断面开切眼分次掘进支护参数优化[ J ]. 金属矿山,2012( 9 ):9 - 12,145.
[ 6 ] 安柏忠. 综放面大断面切眼支护技术研究[ J ]. 煤炭与化工,2016,39( 2 ):73 - 75.
[ 7 ] 尚 刚. 综采大断面切眼一次成巷技术研究[ J ]. 煤炭与化工,2014,37( 8 ):94 - 97.
[ 8 ] 张宏升,王君得. 综放工作面大断面切眼采煤机扩掘技术[ J ]. 煤矿安全,2013,44( 6 ):82 - 83,87.
[ 9 ] 王明华,白 云,张电吉. 综采工作面切眼采煤机扩削工艺
实践[ J ]. 江西煤炭科技,2018( 2 ):44 - 46,49.
[ 10 ] 姚仲宝,杨智华. 综采工作面切眼采用采煤机扩面技术[ J ]. 煤炭科学技术,2005,33( 7 ):15 - 17.
[ 11 ] 刘国庆. 大断面切眼采煤机扩帮技术实践[ J ]. 中州煤炭,2015( 1 ):34 - 36.
[ 12 ] 刘晓东,尹炳合,苏兰君. 盘道煤业 3203 工作面采煤机扩刷切眼实践与应用[ J ]. 山东煤炭科技,2018( 3 ):104 - 106,109.
[ 13 ] 张其朝,李学文. 综采切眼大断面施工一次成巷技术[ J ]. 煤炭工程,2007( 11 ):39 - 40. |
|
|
|