|
Abstract In order to improve the efficiency of gob gas drainage and reduce gob gas flock of working face, through empirical calculation, numerical simulation, site visits and other theoretical analysis of overlying strata vertical three zone in Zhaozhuang Mine 3304 working face were made to determine the heights in gob of overburden caving zone and fractured zone, which provided scientific basis for determining the location of high drainage final hole.
|