| Technology transformation from pre cast concrete along goaf to super high water gob-side entry |
| Lu Zhimin1,2,3, Hao Yongchao1,2,3 |
| 1. Hebei Coal Research Institute Co., Ltd, Xingtai 054000, China; 2. National Energy Backfilling Mining Technology Key Laboratory, Xingtai 054000, China; 3. Hebei Filling Mining Technology Co., Ltd, Xingtai 054000, China |
|
|
|
|
Abstract Shanxi Jiexiu Zuozegou Mine 2202 working face conducted ultra-high water along the goaf, and technology transformation was made from pre cast concrete along goaf to super high water gob-side entry from the support design, advanced support, filling process 3 aspects. The results showed that this technology can effectively alleviate the tension of mining alternate situation and improve the coal recovery rate.
|
|
|
|
|
|
| [ 1 ] 杨胜利,白亚光,李 佳. 煤矿充填开采的现状综合分析与展望[ J ]. 煤炭工程,2013( 10 ):21 - 23.
[ 2 ] 张 农,陈 红,陈 瑶. 千米深井高地压软岩巷道沿空留巷工程案例[ J ]. 煤炭学报,2015,40( 3 ):494 - 501.
[ 3 ] 张东升,马立强,冯光明,等. 综放巷内充填原位沿空留巷技术[ J ]. 岩 石 力 学 与 工 程 学 报, 2005, 24 ( 7 ):1 164 - 1 168.
[ 4 ] 杨 明,华心祝. 我国沿空留巷底鼓研究现状及展望[ J ]. 煤矿安全,2015,46( 12 ):214 - 217.
[ 5 ] 高 峰,钱鸣高,缪协兴. 老顶给定变形下直接顶受力变形分析[ J ]. 岩石力学与工程学报,2000,19( 2 ):145 - 148.
[ 6 ] 陈 勇,柏建彪,徐 营,等. 沿空留巷巷旁支护体宽度的合理确定 [ J ]. 煤炭工程,2012,44( 5 ):4 - 7. |
|
|
|