| Study on stress distribution and control technology of perimeter rock for residual coal recovery mining at the 3218 working face of Jingxing Industry |
| Wang Jinbo |
| Shanxi Yangcheng Yangtai Group Jingxin Coal Industry Corporation Ltd., Jincheng 048100, China |
|
|
|
|
Abstract In order to ensure the safe mining of 3218 working face in Shanxi Yangcheng Yangtai Group Jingxing Coal Industry, based on the specific conditions of the working face, through theoretical analysis and numerical simulation, the distribution law of stress and plastic zone in the surrounding rock was analyzed. The main factors influencing the basic roof in the goaf were the yield deformation of the coal column width. The ratio of plastic yield failure in coal pillar decreased with the increase of width of coal pillar. Combined with the numerical simulation results and the specific situation of the working face, it was determined that the working face area over the empty roadway adopted the monolithic column + wood pile support method, steel fiber wedge method in the falling area. and the working face over the risk is supported by the coal column and wood pile support method. The results showed that the support adaptability was good when the working face mining through the empty roadway area, and the working face passed the empty roadway and caving area.
|
|
|
|
|
|
| [ 1 ] 李俊堂. 工作面过空巷充填开采支护研究[ J ]. 采矿技术,2019,19( 5 ):16 - 19.
[ 2 ] 徐青云,宁掌玄,朱润生,等. 综放工作面充填过空巷顶板失稳机理及控顶研究[ J ]. 采矿与安全工程学报,2019,36( 3 ):505 - 512.
[ 3 ] 鲁伟杰. 阳煤一矿综采工作面过空巷围岩稳定原理及充填参数研究[ D ]. 徐州:中国矿业大学,2017.
[ 4 ] 金 洋. 浅埋煤层过空巷覆岩运移规律的离散元数值模拟[ D ]. 太原:太原理工大学,2017. |
|
|
|