| Study on surrounding rock control technology of -980 m crossed roadway in Xingdong Mine |
| Hou Chao |
| Xingdong Mine, Jizhong Energy Corporation Ltd., Xingtai 054000, China |
|
|
|
|
Abstract Aiming at the problems of serious deformation and difficult support of the surrounding rock in the deep high-stress roadway of Xingdong Mine, through analysis of the surrounding rock maintenance characteristics of the -980 m rock contact roadway in Xingdong Mine, an “anchor + metal mesh + anchor cable + sprayed concrete "surrounding rock control scheme for joint support and practice on site was given. The results showed that the scheme can maintain the stability of the surrounding rock of the roadway, achieve the purpose of support, and provide a reference for the control of the surrounding rock of other roadways in the mine.
|
|
|
|
|
|
| [ 1 ] 张玉生. 基于锚杆拉拔试验巷道支护设计方法研究[ D ]. 西安:西安科技大学,2014.
[ 2 ] 刘武阁. 垂直重叠巷道安全距离数值模拟研究[ D ]. 青岛:山东科技大学,2012.
[ 3 ] 苏 帅. 大倾角复合顶板煤巷支护技术研究与应用[ D ]. 淮南:安徽理工大学,2018.
[ 4 ] 彭 伟,李 军,荆 平,等. 弱胶结软岩斜井支护形式及监测方案研究[ J ]. 山西建筑,2015,23( 8 ),37 - 38.
[ 5 ] 李树彬. “三软”煤层回采巷道钻孔卸压控制围岩变形研究[ D ]. 焦作:河南理工大学,2019.
[ 6 ] 张修峰. 分阶段动态支护法在超千米深井大断面软岩巷道支护中的应用[ J ]. 煤矿开采,2016( 5 ):50 - 52.
[ 7 ] 聂荣山. 不同应力对薄层复合顶板稳定性影响分析[ D ]. 西安:西安科技大学,2012.
[ 8 ] 勾攀峰,韦四江,张 盛. 不同水平应力对巷道稳定性的模拟研究[ J ]. 采矿与安全工程学报,2010( 2 ):143 - 148.
[ 9 ] 宋开峰,孙钦亮. 利用地应力条件优化巷道布置及支护设计[ J ]. 山东煤炭科技,2012( 1 )119 - 120. |
|
|
|