|
Abstract Based on the key link of rock tunnel construction speed in broken rock, loading and transportation process, Wutong Mine practice using a variety of mechanical equipment was summarized, which chose “hydraulic drill jumbo + excavating loader + electric locomotive series of car transport belt conveyer machine assembly”, the technology reduced the labor intensity of workers, improved work efficiency, speeded up the big cross section rock drivage.
|