|
Abstract There were lots of large pumping equipments, cables and supply pipes in mechanized mining. String carhad long length and required overall movement while relocation. But it was difficult to turn bypass “T” port. Aiming at this problem, through research and analysis, the solution to the problem was put forward, the good effect was gained, which provided a referential experience for other similar situation.
|