| Analysis of deformation and failure characteristics and control scheme of inclined shaft in Xinsan Mine |
| Yang Hongen |
| Xinsan Mine, Jizhong Energy Fengfeng Group, Handan 056200, China |
|
|
|
|
Abstract In view of the wellbore failure in the inclined shaft of Xinsan Mine, the FLAC3D software was adopted to numerically simulate the deformation of the surrounding rock at the specific position of the inclined shaft under three conditions: unsupported, long anchor and joist steel. The support effect under three kinds of numerical simulations was summarized. The deformation law of surrounding rock in the weak inclined rock layer was obtained, and the final support scheme was determined by combining engineering examples. The results showed that the anchor support scheme had the best support effect at 700 m in numerical simulation, and the joist steel and anchor were used alternately in the support, with the best support effect.
|
|
|
|
|
|
| [ 1 ] 张志荣,岳太刚,马立强. 主斜井井底溜煤眼及给煤机硐室
快速施工技术[ J ]. 煤炭工程,2011( 1 ):28 - 30.
[ 2 ] 静玉涛. 浅部基岩层下主斜井井筒支护设计[ J ]. 陕西煤炭,
2011( 3 ):50 - 51.
[ 3 ] 周月明,王勇涛,郜普涛. 斜井井筒穿越高原冻土层支护设
计与施工[ J ]. 煤炭工程,2011( 10 ):31 - 33.
[ 4 ] 王卫军,袁 越,,余伟健,等.采动影响下底板暗斜井的破
坏机理及其控制[J]. 煤炭学报,2014,39(8):1 463-1 472.
[ 5 ] 董维新. 浅论常兴煤业主斜井井筒锚网索喷支护的应用[J].
煤,2011, 20(s1):18-20. |
|
|
|