| Numerical simulation analysis of high water filling in gob-side entry retaining roadway |
| Meng Xiaoqiang1, Hu Chengjun2, Jin Zhixin2 |
| 1. Gequan Mine, Jizhong Energy Resources Corporation Ltd., Xingtai 054000, China; 2. China Coal Handan Design Engineering Corporation Ltd., Handan 056031, China |
|
|
|
|
Abstract In order to analyze and study the influence of different width of high water filling body on roadway surrounding the roadway along the goaf, the 12305 working face of Yunjialing Mine was taken as the research background, and the evolution law of stress and strain of surrounding rock was studied by FLAC3D numerical simulation software when the width of the filling body was 2 m, 3 m and 4 m respectively. The results showed that the larger the width of the filling body was, the smaller the lateral support pressure was, the greater the relative deformation of the coal side, the greater the bearing and deformation of the filling body. When the width of the filling body was 3 m, the adaptability of the backfill and the roof was better, and so was the stability of the surrounding rock, and the field practice was verified by the field practice.
|
|
|
|
|
|
| [ 1 ] 张 农,韩昌良,阚甲广,等. 沿空留巷围岩控制理论与实践[ J ]. 煤炭学报,2014,39( 8 ): 1 635 - 1 641.
[ 2 ] 李迎富,华心祝. 二次沿空留巷关键块的稳定性及巷旁充填体宽度确定[ J ]. 采矿与安全工程学报,2012,29( 6 ):783 - 789.
[ 3 ] 李国栋,王襄禹. 沿空留巷下位岩层断裂特征数值模拟及控制技术研究[ J ]. 煤炭科学技术,2017,39(4):50-55.
[ 4 ] 陈 东,采矿数值模拟无煤柱开采沿空留巷支护参数研究[ J ]. 煤炭与化工,2013,35( 9):1 - 3
[ 5 ] 李迎富. 二次沿空留巷围岩稳定性控制机理研究[ D ]. 淮南:安徽理工大学,2012.
[ 6 ] 薛俊华,韩昌良. 大采高沿空留巷围岩分位控制对策与矿压特征分析[ J ]. 采矿与安全工程学报,2012,29( 4 ):466 - 473.
[ 7 ] 杨绿刚. 深部大采高充填开采沿空留巷矿压规律及协同控制研究[ D ]. 北京:中国矿业大学( 北京),2013. |
|
|
|