|
Abstract Based on problems in every link of the coal slime water system in Datun Coal Preparation Plant, measures of the adjustment of flocculant, control flotation operation parameters, changing the tail coal filter feeding way were adopted, improving the processing capacity of each link, e processing capacity of the equipment, providing reference for the washing of mudstone raw coal mine.
|