|
Abstract Hydrogeological condition, integrated monitoring system and installation of the roadway working face were introduced, the operation environment and wireless monitoring technology of underground integrated monitoring system were discussed, relationship of microseismic, stress and gas emission in coal and gas outburst based on data parameter of comprehensive monitoring system, outburst prevention measures of upper corner piping drainage and two way parallel drilling were adopted.
|