| Hard Roof Along Gob-Side Entrydriving Coal Pillar Width and Supporting Technology Research |
| ZHAO Xue-bin |
| Fenghuangshan Mine, Shanxi Jincheng Mining Group, Jincheng 048007, China |
|
|
|
|
Abstract Based on No. 15 coal seam gob-side entrydriving support problem of Fenghuang mountain, and combining with the geological and production conditions, using methods of theoretical analysis, numerical simulation and field practice, the reasonable No.15 numerical simulation coal pillar width was studied, roadway supporting parameter design was carried out. Research showed that the narrow coal pillar width between 4 ~ 5 m was reasonable, bolt as the basic support, anchor cable as strengthening the supporting of roadway surrounding rock supporting form can effectively control stability, ensure the security and stability of roadway along the empty.
|
|
|
|
|
|
| [ 1 ] 赵国贞,马占国,孙 凯,等. 小煤柱沿空掘巷围岩变形控制机理研究[ J ]. 采矿与安全工程学报,2010,27(4 ):517 - 521.[ 2 ] 刘增辉,高 谦,华心祝,等. 沿空掘巷围岩控制的时效特征[ J ] . 采矿与安全工程学报,2009,26(4 ):465 - 469.[ 3 ] 张 镇,康红普,王金华. 煤巷锚杆-锚索支护的预应力协调作用分析[ J ] . 煤炭学报,2010,35(6 ): 881 - 886.[ 4 ] 张 农,高明仕. 煤巷高强预应力锚杆支护技术与应用[ J ]. 中国矿业大学学报,2004, 33 (5 ):524 - 527.[ 5 ] 罗立平. 矿井水老空水形成机制与防水煤柱留设研究[ D ]. 北京: 中国矿业大学(北京), 2010.[ 6 ] 刘 洋,伍永平,王永胜. 断层上盘防水煤柱合理宽度研究 [ J ] . 西安科技大学报, 2010, 30(5 ):523 - 529.[ 7 ] 曹秋菊,王金安,纪洪广. 不整合地层下开采防水煤柱合理宽度研究[ J ]. 中国矿业,2012,21(3 ): 66 - 69. |
|
|
|