|
|
|
| Determination of caving ratio in mining process of Mine |
| Si Jinwen |
| 1. Henan Polytechnic University, Institute of Energy Science and Engineering, Jiaozuo 454150, China; 2. Shanxi Coal Transportation Group Nanhe Coal Industry Corporation Ltd., Jincheng 048400, China |
|
|
|
|
Abstract In order to study ranges of overburden fractures with different mining ratios, the method that combining theoretical calculation with numerical simulation experiment was adopted to analyze range of fracture zones after mining. Theoretical analysis was used to analyze range of fracture zones when fully mechanized mining height was 8m, and the range was about 53.8~100 m. UDEC numerical simulation method was used to experimentally analyze the fracture zone range at different mining ratios, the simulation result showed that the fracture zone height was inside range of numerical calculation. With increasing mining ratios, the crack range was gradually decreased. Finally, based on mine specific production conditions, ratio of mining was determined as 1∶1, which meant mining was 4 m and discharging was 4 m.
|
|
|
|
|
|
| [ 1 ] 孙 琦,张向东,杨 逾,王 星. 公路下充填开采的相似材料及数值模拟研究[ J ]. 广西大学学报( 自然科学版 ),2011( 4 ):635 - 639.
[ 2 ] 仇圣华,曹福辉,杨志锡,刘 猛,郑景龙,种欲伟. 近距离煤层采后覆岩导水裂隙带高度数值模拟研究[ J ]. 中国煤炭,2012( 11 ):44 - 47.
[ 3 ] 题正义,秦洪岩. 确保地表建筑物安全矸石充填开采原料配比及充填量的确定[ J ]. 中国安全生产科学技术,2014( 12 ):138 - 142.
[ 4 ] 丁 伟,刘琴文. 浅谈丹江口大坝加高工程砂石料水下开采[ J ]. 河南水利与南水北调,2012( 22 ):87 - 89.
[ 5 ] 焦申华,王金安. 水下开采覆岩破坏及导水特征研究[ J ]. 工业安全与环保,2015( 3 ):69 - 72. |
|
|
|