|
Abstract Based on influence of roof disaster in digging process, prevention measures were prepared in advance. Taking Shanxi Huarong Longgong Coal Industry Corporation as an example, its measures to prevent roof disaster were introduced, design calculation of roof support was made with monitoring.
|