|
Abstract After many years of enormous changes in Fengfenf Group Xiaotun Mine, ventilation resistance became bigger and ventilation section shrunk which caused ventilation difficulty. In addition, deep temperature was higher and gas gushing amount increased which put forward higher requirements for ventilation. Based on these problems, mine ventilation system was conducted technical modification and breakthrough error of fresh air well was predicted.
|