Abstract In order to increase advance rate in rock roadway of underground coal mine, achieve interoperability of mine production system and improve tension of mining replacement, drilling and blasting method together with fully mechanized mining method used in rock drivage which were popular in chinese major coal enterprises were discussed. Meanwhile, the adaptation of their corresponding mechanical scheme in roadway construction site were summarized.
|
|
|
|
|
|
| [1 ] 赵宏伟. 我国煤矿岩巷快速掘进技术现状及展望[ J ]. 煤炭科学技术,2012( 1 ):5-7.
[ 2 ] 刘世阳. 顾北矿综合机械化岩巷快速掘进技术研究[ J ]. 煤炭技术,2010( 3 ):85-87.
[ 3 ] 任建民. 发挥综合机械化优势 实现岩巷快速掘进[ J ]. 煤炭技术,2009( 4 ):15-17. |
|
|
|