|
Abstract In order to avoid deviation of?hoisting conveyance in vertical shaft cooperation damaging shaft equipment and causing tank and broken cable accidents, shaft guide plays an important role in lifting container running track and steel rope guide dimensional inspection work in vertical shaft using wire rope guide. Based on mandatory periodic dimension inspection, taking line protection measures, conducting regular test, replacing whole rope regularly etc., service life of steel rope guide can be prolonged and lifting safety accidents can be reduced.
|