|
Abstract The influenced radius of gas drilling drainage was taken as study object, gas drainage rate of crossing drilling and bedding drilling process was analyzed under same construction technology and drainage time, the influenced radius of gas drainage drilling was measured by gas pressure index method, the efficiency rate of crossing drilling exceeds bedding drilling by 15%, with reference for gas drainage down the road.
|