| Study on ends large area hanging roof control technology in thick coal seam fully mechanized working face |
| Wang Bing1, Sun Nianchang1, Yu Haiyang2, Wang Wei1 |
| 1. Yangcun Mine, Yanzhou Mining Industry Corporation Ltd., Jining 272000, China; 2. Dongtan Mine, Yanzhou Mining Industry Corporation Ltd., Zoucheng 273512, China |
|
|
|
|
Abstract Based on large area hanging roof in air return roadway and triangle area in transportation roadway in the recovery of fully mechanized working face, hard to collapse, with serious danger, high pressure water cracking coal and rock theory was used to analyze high pressure water injection cracking top coal in fully mechanized working face ends. Based on the hanging roof in Yangcun Mine, high pressure water injection was adopted in working face ends, setting load was reduced by removing anchor bolt and anchor rope firmware, which effectively solved the problem, improved the coal recovery rate, with safe and economic effect.
|
|
|
|
|
|
| [ 1 ] 郝珠成,邓广哲,吴学松,等. 注水对顶煤强度及冒放性的影响机理研究[ J ]. 西安科技大学学报,2012,32(5 ): 571-574.
[ 2 ] 郝 雷,武光辉,袁西亚,等. 厚煤层综放工作面顶煤冒放 性及回收率分析[ J ]. 陕西煤炭,2015(2 ):29-30.
[ 3 ] 栗成杰,李树伟. 综采工作面端头大面积悬顶控顶技术[ J ]. 陕西煤炭,2008,36(8 ):26-30.
[ 4 ] 张金才. 岩体渗流与煤层底板突水[ M ]. 北京:地质出版社,1997.
[ 5 ] 闫少宏,宁 宇,康立军,等. 用水力压裂处理坚硬顶板的机理及实验研究[ J ]. 煤炭学报,2000,25(1 ):32-35.
[ 6 ] 侯朝炯,勾攀峰. 巷道锚杆支护围岩强度强化机理研究[ J ]. 岩石力学与工程学报,2000,19(3 ):342-345.
[ 7 ] 李 冲,徐金海,吴 锐,等. 综放工作面回采巷道锚杆支护解除机理与实践[ J ]. 煤炭学报,2011,36(12 ):2 018- 2 023.
[ 8 ] 万 峰,张洪清,韩振国.液压支架初撑力与工作面矿压显现关系研究[ J ]. 煤炭科学技术,2011,39(6 ):18-20 |
|
|
|