|
Abstract Based on the main shaft floor coal leaking problem in Chiyu Mine, according to the quantity of leaking coal of main shaft, skip loading, chamber position, shaft water spray, the underground floor cleaning coal system was designed, the use of level warehouse transfer machine was introduced.
|