| The Big Chamber Whole Section Anchor in Kilometer Deep Well Technology Applied in Jiulong Mine |
| QIU Yong-jun |
| Iulong Mine, Baofeng Mining Industry Group Corporation Ltd., Fengfeng Group, Jizhong Energy, Handan 056201, China |
|
|
|
|
Abstract According to south wing the second level -850 m large section in pump house and power substation and broken surrounding rock in Jiulong Mine, whole section anchoring inforcement technology was conducted. Especially, total length of prestressed anchor cable combining comprehensive grouting support technology was employed to roadeay floor, instead of metal bottom beam and concrete arch over the bass drum, realizing floor anchor cable actively supporting. Strictly preventing stress breaking from the thinnest place, providing technical experience of large section and roadway supporting under soft and complex conditions.
|
|
|
|
|
|
| [1 ] 刘银志,贾明魁. 高应力三软煤层大断面沿空掘巷锚网支护技术[ J ] .煤炭科学技术,2011. 4(31 ):17 - 19 .[2 ] 何满朝,钱七虎. 深部岩体力学基础[ M ].北京:科学出版社,2010.[3 ] 康红普,姜铁明, 高富强.预应力在锚杆支护中的作用[ J ]. 煤炭学报,2007(7 ):680 - 685.[4 ] 邓广涛,贾明魁,马念杰. 人工神经网络在煤巷顶板岩性识别中的应用[ J ].采矿与安全工程学报,2006,23(2 ):182 - 186. |
|
|
|