| Study on coal pillar mining scheme of industry square mining in Jinggezhuang Mine |
| Zhang Lianzhong1,2 |
| 1. School of mining engineering, North China university of Technology Institute, Tangshan 063000, China; 2. Kailuan (group) Jinggezhuang Mining Branch, Tangshan 063000, China |
|
|
|
|
Abstract Based on exhausted resource and difficult mining succession, two kinds of industry square mining plan were put forward, they are Nangongfang coal pillar peripheral symmetric coordinating skip clean mining and partial mining, the extreme value of ground movement and deformation and impact damage level were analyzed by MSAS. The result showed that the former technology fully takes account for the protection of building and equipment, ensures the cost and efficiency of production, as the final plan, it is more reasonable and provides theoretical basis for industry square coal pillar mining in Jinggezhuang Mine
|
|
|
|
|
|
| [ 1 ] 郭文兵,柴一言. 条带开采采场应力分布规律的光弹性实验研究[ J ]. 辽宁工程技术大学学报(自然科学版),1998(6 ):590 - 594.
[ 2 ] 谢和平,周宏伟,王金安,等. FLAC在煤矿开采沉陷预测中的应用及对比分析[ J ]. 岩石力学与工程学报,1999,18(4 ):397 - 401.
[ 3 ] 郝志勇,林柏泉,张家山,等. 基于UDEC的保护层开采中覆岩移动规律的数值模拟与分析[ J ]. 中国矿业,2007,16(7 ):81 - 84.
[ 4 ] 尹光志. ( 急 )倾斜煤层深部开采覆岩变形力学模型及应用[ J ]. 重庆大学学报(自然科学版),2006,29(2 ):79- 82. |
|
|
|