|
Abstract Based on local ventilator double circuit power supply, alternate partial ventilator electrical leakage protection, mining machine overcurrent protection setting problems, the reason was analyzed, through the optimized design, the solving plan was put forward. The practice showed that the design could solve the problems and provide experience and reference for similar condition.
|