| Gob-side Entry Retaining Numerical Simulation Support Parameters Research |
| CHEN Dong |
| The Great Wall Coal Mine Corporation Ltd., Shandong Energy Xinkuang Group, Ordos 016299, China |
|
|
|
|
Abstract The Steel pipe concrete pier column support gob-side entry retaining roof of gob side was a new support technology. Using the finite element software FLAC3D simulated gob-side entry retaining effect, at the same time set up several observation station to verify the supporting effective and the result of numerical simulation. The results showed the technology for steel pipe concrete pier supported was feasible, although with large floor heave, it can satisfy the use requirements of mining roadway. At the same time, it provided research direction for supporting parameter.
|
|
|
|
|
|
| [ 1 ] 孙恒虎,赵炳利.沿空留巷的理论与实践[ M ] .北京:煤炭 工业出版社,1993.[ 2 ] 华心祝. 我国沿空留巷支护技术发展现状及改进建议[ J ] . 煤炭科学技术,2006,34( 12 ):78 - 81.[ 3 ] 马茂兵,杨东光,李 炜. 基于FLAC数值模拟技术的沿空留巷应力分析[ J ] .技术与经济,2011,6( 12 ):32 - 34.[ 4 ] 李学彬,曲广龙,黄万鹏,等.高支承压力区沿空留巷充填体强化支护的数值模拟研究[ J ] . 煤矿开采,2010,12( 6 ) :48 - 51.[ 5 ] 康红普,牛多龙,张 镇,等.深部沿空留巷围岩变形特征与支护技术[ J ] .岩石力学与工程学报,2010,10( 29 ) :1977 - 1987. |
|
|
|