|
|
|
| Topsoil Underground Corridor through Railway Deformation Numerical Simulation Analysis |
| ZHI Bao-yan, SONG Gang, HU Cheng-jun |
| China Coal Handan Design Engineering Corporation Ltd., Handan 056031, China |
|
|
|
|
Abstract For the problem of Dongpo Mine to Liujiakou Coal Preparation Plant conveyor coal transportation system crossing the below of Pingshuo Mine opencast special railway in K12 + 965, the method of numerical simulation was adopted, the deformation conditions of the belt corridor under the initial support were simulated. Calculation results showed that the underground corridor construction through railway sidings had little impact on railway and the surface deformation, completely in the range of specification, the analysis results had important guiding significance on engineering design and construction.
|
|
|
|
|
|
| [ 1 ] 王新征,邢利英,马可栓.既有铁路下浅埋暗挖通道地表沉降的数值模拟[ J ]. 四川建筑科学研究,2010,8(36 ):146 - 149.[ 2 ] 冯卫星,侯学渊,夏明耀.隧道施工引起地面沉陷的几何非线性分析[ J ]. 岩石力学与工程学报,1995,14(1 ):289 - 296[ 3 ] 薄海龙,王丽娟,周小平. 矿区铁路下开采引发地基沉陷的数值分析[ J ]. 国防交通工程与技术,2009(1 ):29 - 30.[ 4 ] 朱伯芳.有限单元法原理与应用 [ M] . 第二版.北京:中国水利水电出版社,1998.[ 5 ] 孙 钧,汪炳锏.地下结构有限元法解析[ M ]. 上海:同济大学出版社,1988.[ 6 ] 刘 辉.浅埋暗挖法和盾构法在城市地铁中的应用[ J ].铁道工程学报,2002(2 ):56 - 57. [ 7 ] 姬永红,康金龙,袁 伟. 暗挖电力隧道下穿既有地道对地道和土层变形影响的数值模拟分析[ J ]. 城市道桥与防洪,2013( 6 ): 269 -271. |
|
|
|